Keele University Campus

Lennard Jones Laboratory

Two storey new build laboratory building connected to existing building with ground floor link steel frame construction with concrete floors. 

“The new building provides an additional 60-space laboratory equipped with 18 fume cupboards, a preparation area and an analytical area, together with a technical support office to service the laboratory

New Nursery

Construction of a new single storey nursery, with green roof and Photovoltaic Cells which contribute towards the very good BREEAM rating for this building.  A central play area is formed in the courtyard with a perimeter fence as well as a low level fence to the external play areas.  A new 35 space car park was also constructed at the bottom of the site, linking through to the university road system.

Works included the installation of external play surfacing and external play equipment.

David Weatherall Building

Construction a two-storey extension to existing University Medical School.  This extends the Anatomy Skills Facility to provide up to date teaching environment including built in audio visual and video capture technology for anatomical procedures.

 

View Keele University Breeam Excellent Certificate

 

Keele University Campus Images

Key Facts

  • Client: Keele University
  • Total Value: £5.8 Million
  • Project Duration: 52 Weeks